The following checklist is an overview of the milling parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, this list provides space for checking the progress of each piece of all of these items.
 
The following checklist is an overview of the milling parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, this list provides space for checking the progress of each piece of all of these items.
  
{| style="text-align: center; color:black; background: #efefef; border: 1px solid blue;" cellpadding="4" cellspacing="0"
+
{| style="text-align: center; color:black; background: #efefef; border: 1px solid blue;" cellpadding="4" cellspacing="0" border="1"
 
|+ Diffusion box
 
|+ Diffusion box
 
! width="50"  | Status
 
! width="50"  | Status

Revision as of 08:43, 21 October 2011

This page is under construction.
It requires a review!

⇐ Back to the Kaon Detector page

Drawings

Links to drawings files.

Material orders

The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13!

The material for the construction of the detector at the Machine Shop of CUA.
MaterialsAtMachineShop.JPG
MaterialsAtMachineShop2.JPG

Checklist of the milling parts

The following checklist is an overview of the milling parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, this list provides space for checking the progress of each piece of all of these items.

Diffusion box
Status Piece Drawing