The following checklist is an overview of the milling parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, this list provides space for checking the progress of each piece of all of these items. | The following checklist is an overview of the milling parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, this list provides space for checking the progress of each piece of all of these items. | ||
− | {| style="text-align: center; color:black; background: #efefef; border: 1px | + | {| style="text-align: center; color:black; background: #efefef; border: 1px light blue;" cellpadding="4" cellspacing="0" border="1" |
|+ Diffusion box | |+ Diffusion box | ||
! width="50" | Status | ! width="50" | Status |
Revision as of 08:43, 21 October 2011
This page is under construction. It requires a review! |
⇐ Back to the Kaon Detector page |
Drawings
Links to drawings files.
Material orders
The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13!
Checklist of the milling parts
The following checklist is an overview of the milling parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, this list provides space for checking the progress of each piece of all of these items.