Difference between revisions of "MainPage:Nuclear:KaonDetector:AerogelDetectorConstruction"
Line 58: | Line 58: | ||
|- | |- | ||
| 6 | | 6 | ||
− | | [[File: | + | | [[File:RightArrowGreen.jpg|15px]] |
| style="text-align: left;" | Tube port cover | | style="text-align: left;" | Tube port cover | ||
| 67165-00019 sh. 4 | | 67165-00019 sh. 4 | ||
Line 68: | Line 68: | ||
|- | |- | ||
| 22 | | 22 | ||
− | | [[File: | + | | [[File:Drop.gif|15px]] |
| style="text-align: left;" | PMT outer shield end plate | | style="text-align: left;" | PMT outer shield end plate | ||
| 67165-00019 sh. 4 | | 67165-00019 sh. 4 | ||
Line 78: | Line 78: | ||
|- | |- | ||
| 2 | | 2 | ||
− | | [[File: | + | | [[File:Drop.gif|15px]] |
| style="text-align: left;" | Diffusion box vertical | | style="text-align: left;" | Diffusion box vertical | ||
| 67165-00019 sh. 5 | | 67165-00019 sh. 5 | ||
Line 98: | Line 98: | ||
|- | |- | ||
| 2 | | 2 | ||
− | | [[File: | + | | [[File:Drop.gif|15px]] |
| style="text-align: left;" | Diffusion box horizontal bar | | style="text-align: left;" | Diffusion box horizontal bar | ||
| 67165-00019 sh. 8 | | 67165-00019 sh. 8 | ||
Line 112: | Line 112: | ||
| 67165-00019 sh. 8 | | 67165-00019 sh. 8 | ||
|} | |} | ||
− | (Legend: [[File:Check.png|15px]] is ready, [[File:RightArrowGreen.jpg|15px]] is being milled at the moment and [[File:Empty.png|15px]] is not milled) | + | (Legend: [[File:Check.png|15px]] is ready, [[File:RightArrowGreen.jpg|15px]] is being milled at the moment, [[File:Drop.gif|15px]] is being water-cut for future milling and [[File:Empty.png|15px]] is not milled) |
It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays. | It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays. |
Revision as of 15:25, 26 October 2011
This page is under construction. It requires a review! |
⇐ Back to the Kaon Detector page |
Drawings
Links to drawings files.
Material orders
The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13!
Checklist of the progress on the milling
The following checklists are an overview of the main parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, these list provide the status on the progress for each piece of all of the items.
Last update: October 21, 2011
(Legend: is ready,
is being milled at the moment,
is being water-cut for future milling and
is not milled)
It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays.
(Legend: is ready,
is being milled at the moment and
is not milled)