The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13th! | The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13th! | ||
− | {| | + | {{multiple image |
− | | | + | | width = 300 |
− | | | + | | footer = The material for the construction of the detector at the Machine Shop of CUA. |
− | |} | + | | image1 = MaterialsAtMachineShop.JPG |
+ | | alt1 = Material at the CUA Machine Shop | ||
+ | | caption1 = | ||
+ | | image2 = MaterialsAtMachineShop2.JPG | ||
+ | | alt2 = Material at the CUA Machine Shop | ||
+ | | caption2 = | ||
+ | }} | ||
[[Image:MaterialsAtMachineShop.JPG|thumb|center|x200px|The material for the construction of the detector at the Machine Shop of CUA.]] | [[Image:MaterialsAtMachineShop.JPG|thumb|center|x200px|The material for the construction of the detector at the Machine Shop of CUA.]] | ||
upright=0.56 | upright=0.56 |
Revision as of 23:46, 13 October 2011
Overview of the Aerogel Detector
Description of the purpose of this detector and it's characteristics.
Drawings
Links to drawings files.
Material orders
The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13th!