− | (Legend: [[File:Check.png|15px]] is ready, [[File:RightArrowGreen.jpg|15px]] is being milled at the moment, [[File:Drop.gif|15px]] | + | (Legend: [[File:Check.png|15px]] is ready, [[File:RightArrowGreen.jpg|15px]] is being milled at the moment, [[File:Drop.gif|15px]] was cutted (water cutting) for future milling and [[File:Empty.png|15px]] is not milled) |
It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays. | It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays. |
Revision as of 21:35, 10 November 2011
This page is under construction. It requires a review! |
⇐ Back to the Kaon Detector page |
Drawings
Links to drawings files.
Materials and pieces machining
The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul and Michael started milling the first piece of our new detector on October 13!
This construction is being conducting under a collaboration between the Nuclear Physics Group and the Vitreous State Laboratory group (VSL).
Checklist of the progress on the milling
The following checklists are an overview of the main parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, these list provide the status on the progress for each piece of all of the items.
Last update: October 26, 2011
(Legend: is ready,
is being milled at the moment,
was cutted (water cutting) for future milling and
is not milled)
It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays.
(Legend: is ready,
is being milled at the moment and
is not milled)