Difference between revisions of "MainPage:Nuclear:KaonDetector:AerogelDetectorConstruction"

From cua_phy
Jump to navigation Jump to search
Line 168: Line 168:
  
 
{| border="0" halign="center"
 
{| border="0" halign="center"
|+'''Pieces of the detector that are ready.'''
+
|+'''Material cutted.'''
 
|-
 
|-
 
| valign="center"|
 
| valign="center"|
[[File:SideBarWaterCutted.jpg|thumb|center|x200px|6x Tube Port Cover, to close the top ports when the optional PMTs are not being using.]]
+
[[File:SideBarWaterCutted.jpg|thumb|center|250px|6x Tube Port Cover, to close the top ports when the optional PMTs are not being using.]]
 
| valign="center"|
 
| valign="center"|
 
[[File:BoxVerticalBars.jpg|thumb|center|250px|2x Diffusion Box Vertical Bar, that will allow to hold the aerogel trays with the diffusion box]]
 
[[File:BoxVerticalBars.jpg|thumb|center|250px|2x Diffusion Box Vertical Bar, that will allow to hold the aerogel trays with the diffusion box]]
 
|}
 
|}

Revision as of 22:31, 10 November 2011

This page is under construction.
It requires a review!

⇐ Back to the Kaon Detector page

Checklist of the progress on the milling

The following checklists are an overview of the main parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, these list provide the status on the progress for each piece of all of the items.

Last update: November 10, 2011

Diffusion box
Qty. Status Part Drawing
1 Empty.png Cover plate 67165-00012 sh. 1
1 Check.png Attachment plate 67165-00016 sh. 1
1 Check.png Interface plate 67165-00018 sh. 1
6 Check.png Tube port cover 67165-00019 sh. 4
22 Empty.png PMT outer shield 67165-00019 sh. 4
22 Drop.gif PMT outer shield end plate 67165-00019 sh. 4
22 Empty.png PMT inner shield 67165-00019 sh. 5
2 Drop.gif Diffusion box vertical 67165-00019 sh. 5
1 Drop.gif Diffusion box top 67165-00019 sh. 6
1 RightArrowGreen.jpg Diffusion box lower 67165-00019 sh. 7
2 RightArrowGreen.jpg Diffusion box vertical bar 67165-00019 sh. 8
2 RightArrowGreen.jpg Diffusion box horizontal bar 67165-00019 sh. 8
22 Empty.png PMT spacer 67165-00019 sh. 8
1 Empty.png Diffusion box upper plate 67165-00019 sh. 8

(Legend: Check.png is ready, RightArrowGreen.jpg is being milled at the moment, Drop.gif was cutted (water cutting) for future milling and Empty.png is not milled)

It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays.

Aerogel trays
Qty. Status Part Drawing
3x2 Empty.png Aerogel box vertical 67165-00020 sh. 3
3x2 Empty.png Aerogel box horizontal 67165-00020 sh. 4
3x2 Empty.png Aerogel box vertical angle 67165-00020 sh. 5
3x2 Empty.png Aerogel box horizontal angle 67165-00020 sh. 5
3x1 Empty.png Aerogel box bottom plate 67165-00020 sh. 5

(Legend: Check.png is ready, RightArrowGreen.jpg is being milled at the moment and Empty.png is not milled)

Materials and pieces machining

The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul and Michael started milling the first piece of our new detector on October 13!

The materials for the construction of the detector.
MaterialsAtMachineShop.JPG
MaterialsAtMachineShop2.JPG

This construction is being conducting under a collaboration between the Nuclear Physics Group and the Vitreous State Laboratory group (VSL).

Ready pieces

As the machining process is going on, the first pieces of the Kaon Aerogel Detector are being ready! Paul and Michel are working at the CUA Machine Shop and the progress of the construction can be verified in the following pictures.

Pieces of the detector that are ready.
6x Tube Port Cover, to close the top ports when the optional PMTs are not being using.
2x Diffusion Box Vertical Bar, that will allow to hold the aerogel trays with the diffusion box
Interface plate and Attachment plate on the milling cutter. They are going to hold all the detector on a trail at the SHMS.

Some of the materials require the cut of large pieces, for instance, the side plates of the diffusion box and also the PMT's end plates. These cuttings are related to the pieces that will hold the PMTs in the detector. As the PMTs have an overall diameter of 5", holes with this dimensions were required in that material.

As a first step on the machining of these pieces, they were send to a company for a water cutting.

Material cutted.
6x Tube Port Cover, to close the top ports when the optional PMTs are not being using.
2x Diffusion Box Vertical Bar, that will allow to hold the aerogel trays with the diffusion box