(Created page with "DETECTORS AT JLAB (Arthur, Richard) * SHMS Aerogel detector ::* broken bolts on top fixed with help of Walter's team - uses same holes as before, drilled/tapped and installed ne...")
 
 
(2 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
::::* Diameter is less than 19.2 mm as requested, result from 4 randomly selected PMTs: 19.0 +-0.2 mm - see [http://www.vsl.cua.edu/cua_phy/images/0/02/IMG_5238.jpg this picture]
 
::::* Diameter is less than 19.2 mm as requested, result from 4 randomly selected PMTs: 19.0 +-0.2 mm - see [http://www.vsl.cua.edu/cua_phy/images/0/02/IMG_5238.jpg this picture]
 
::::* Labels (est. thickness 50-100 um) are not glued to PMT body as requested to maximize space for shielding - see [http://www.vsl.cua.edu/cua_phy/images/1/19/IMG_5128.jpg picture]
 
::::* Labels (est. thickness 50-100 um) are not glued to PMT body as requested to maximize space for shielding - see [http://www.vsl.cua.edu/cua_phy/images/1/19/IMG_5128.jpg picture]
 +
 +
::* Crystal arrival - latest update: delivery of all 460 by end of September
 +
 +
::* Magnet main coil shipment delayed until end of November (A few pictures: [http://www.vsl.cua.edu/cua_phy/images/1/12/J-lab_1.jpg Pic1], [http://www.vsl.cua.edu/cua_phy/images/f/fe/J-lab_2.jpg Pic2])
  
 
* HMS Aerogel Detector
 
* HMS Aerogel Detector
Line 31: Line 35:
  
 
::* thermal profile simulation - initial results available
 
::* thermal profile simulation - initial results available
 
  
 
* Crystal testing
 
* Crystal testing

Latest revision as of 12:33, 23 August 2017

DETECTORS AT JLAB (Arthur, Richard)

  • SHMS Aerogel detector
  • broken bolts on top fixed with help of Walter's team - uses same holes as before, drilled/tapped and installed new hex bolt, anticipate this to be a recurring issue due to materials difference (stainless steel bolt and aluminum box)
  • still need to take cosmic data to check if light leak fixed - ideally would like scintillators and drift chambers on during this test
  • Trays SP-20, SP-15 and SP-11 are stored in ESB building in roped off area near HKS equipment
  • Neutral Particle Spectrometer
  • Diameter is less than 19.2 mm as requested, result from 4 randomly selected PMTs: 19.0 +-0.2 mm - see this picture
  • Labels (est. thickness 50-100 um) are not glued to PMT body as requested to maximize space for shielding - see picture
  • Crystal arrival - latest update: delivery of all 460 by end of September
  • Magnet main coil shipment delayed until end of November (A few pictures: Pic1, Pic2)
  • HMS Aerogel Detector
  • Testing method to remove Bates PMTs without breaking them
  • Working on PMT scanning setup to test Bates PMTs once installed in the cylinders


PBWO4 STUDIES AT CUA (Richard, Andres)

  • design drawings including thermal design complete
  • indicate existing holes on furnace sides
  • add additional holes needed on furnace top and sides
  • indicate furnace heating elements for interference checks
  • mechanical setup ready and calibrated - link the results
  • heating elements have been installed
  • thermal profile simulation - initial results available
  • Crystal testing
  • all systems ready for crystal testing
  • commissioning of new pulse generator ongoing
  • possible incompatibility between TTL output and electronics - check out manual for input pulse requirements
  • reflector optimization studies ongoing


DATA ANALYSES AND SIMULATIONS (Salina, Dannie)

  • need to resolve issue of current dependence of DVCS coda events vs. DIS events
  • investigate calo part (bottom circuit on page 2) vs. HRS singles (top part of same diagram)
  • Note that HRS has delay of ~1 usec to form trigger, while ARS (calo) takes about 600 ns for signal


  • Resolved several issues in uncertainty calculation, e.g. dependence of mean on specific binning and unit inconsistencies
  • Results look reasonable and encouraging for structure function studies!
  • may want to check consistency with Kijun's calculation of uncertainties
  • Work on detector simulations ongoing


OTHER

  • Vladimir still waiting for visa - hopefully after 1 Sept


NEXT MEETING: WED 30 AUGUST at 10:00 AM (EDT)