Difference between revisions of "MainPage:Nuclear:NPS:PWO:CrystalLOG:CRYTUR01"

From cua_phy
Jump to navigation Jump to search
Line 25: Line 25:
 
|-
 
|-
 
| 12/14/2015 || Thermal annealing || Starting 11:00AM. Ramp up at 18oC/hour until 200oC, stay at 200oC for 10 hours, ramp down at -18oC/hour.
 
| 12/14/2015 || Thermal annealing || Starting 11:00AM. Ramp up at 18oC/hour until 200oC, stay at 200oC for 10 hours, ramp down at -18oC/hour.
 +
|-
 +
| 12/17/2015 || Longitudinal Transmittance || After annealing.
 
|-
 
|-
 
|}
 
|}

Revision as of 15:33, 28 January 2016

⇐ Back to Crystal LOG
⇐ Back to Neutral Particle Spectrometer
⇐ Back to the Main_Page

Time LOG

CRYTUR 01
Date Description Comments
xx/xx/2015 Wrapped Preparing for light yield measurement. Approximately 5 layers of teflon tape, and 2 layers of black tape.
xx/xx/2015 LY scan ...
12/14/2015 unwrapped Preparing for annealing.
12/14/2015 Thermal annealing Starting 11:00AM. Ramp up at 18oC/hour until 200oC, stay at 200oC for 10 hours, ramp down at -18oC/hour.
12/17/2015 Longitudinal Transmittance After annealing.

Pictures at 12/14/2015

xxxx.