Difference between revisions of "MainPage:Nuclear:NPS:PWO:CrystalLOG:SICCAJ22"

From cua_phy
Jump to navigation Jump to search
Line 21: Line 21:
 
|-
 
|-
 
| 01/28/2016 || Thermal annealing || Ramp up at 18oC/hour up to 200oC. Stays for 10 hours and ramp down at 18oC/hour.
 
| 01/28/2016 || Thermal annealing || Ramp up at 18oC/hour up to 200oC. Stays for 10 hours and ramp down at 18oC/hour.
 +
|-
 +
| 02/29/2016 || Light Yield || Run 3146: crystal wrapped with ~5 layers of teflon tape and 2 layers of black tape. Steps of 20min, 1cm. T=18oC. '''LY =  pe/MeV'''.
 
|-
 
|-
 
|}
 
|}

Revision as of 11:11, 29 February 2016

⇐ Back to Crystal LOG
⇐ Back to Neutral Particle Spectrometer
⇐ Back to the Main_Page

Time LOG

SICCA J22
Date Description Comments
12/14/2015 Pictures Documentation of crystal's conditions as it arrived at CUA.
01/28/2016 Thermal annealing Ramp up at 18oC/hour up to 200oC. Stays for 10 hours and ramp down at 18oC/hour.
02/29/2016 Light Yield Run 3146: crystal wrapped with ~5 layers of teflon tape and 2 layers of black tape. Steps of 20min, 1cm. T=18oC. LY = pe/MeV.

Pictures at 12/14/2015

xxxx.
xxxx.