Difference between revisions of "MainPage:Nuclear:KaonDetector:AerogelDetectorConstruction"
Line 30: | Line 30: | ||
The following checklists are an overview of the main parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, these list provide the status on the progress for each piece of all of the items. | The following checklists are an overview of the main parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, these list provide the status on the progress for each piece of all of the items. | ||
− | Last update: October | + | Last update: October 26, 2011 |
<!------------------------------------------------> | <!------------------------------------------------> | ||
<!-- REMEMBER TO CHANGE THE LAST UPDATE ABOVE!! --> | <!-- REMEMBER TO CHANGE THE LAST UPDATE ABOVE!! --> | ||
Line 83: | Line 83: | ||
|- | |- | ||
| 1 | | 1 | ||
− | | [[File: | + | | [[File:Drop.gif|15px]] |
| style="text-align: left;" | Diffusion box top | | style="text-align: left;" | Diffusion box top | ||
| 67165-00019 sh. 6 | | 67165-00019 sh. 6 | ||
Line 98: | Line 98: | ||
|- | |- | ||
| 2 | | 2 | ||
− | | [[File: | + | | [[File:Empty.png|15px]] |
| style="text-align: left;" | Diffusion box horizontal bar | | style="text-align: left;" | Diffusion box horizontal bar | ||
| 67165-00019 sh. 8 | | 67165-00019 sh. 8 |
Revision as of 15:26, 26 October 2011
This page is under construction. It requires a review! |
⇐ Back to the Kaon Detector page |
Drawings
Links to drawings files.
Material orders
The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13!
Checklist of the progress on the milling
The following checklists are an overview of the main parts of the detector and the progress on its construction. As it is going to be constructed one diffusion box and three aerogel trays, these list provide the status on the progress for each piece of all of the items.
Last update: October 26, 2011
(Legend: is ready,
is being milled at the moment,
is being water-cut for future milling and
is not milled)
It is going to be constructed three trays (aerogel boxes). The following list includes the milling parts required for all of these trays.
(Legend: is ready,
is being milled at the moment and
is not milled)