Difference between revisions of "MainPage:Nuclear:NPS:PWO:CrystalLOG:SICCAJ16"

From cua_phy
Jump to navigation Jump to search
Line 23: Line 23:
 
|-
 
|-
 
| 12/15/2015 || LY scan || Measurement of LY along crystal. More details in the LOGBOOK, runs xx..
 
| 12/15/2015 || LY scan || Measurement of LY along crystal. More details in the LOGBOOK, runs xx..
 +
|-
 +
| 02/01/2016 || Thermal annealing || Ramp up at 18oC/hour up to 200oC. Stays for 10 hours and ramp down at 18oC/hour.
 
|-
 
|-
 
|}
 
|}

Revision as of 14:45, 1 February 2016

⇐ Back to Crystal LOG
⇐ Back to Neutral Particle Spectrometer
⇐ Back to the Main_Page

Time LOG

SICCA J16
Date Description Comments
12/14/2015 Pictures Documentation of crystal's conditions as it arrived at CUA.
12/14/2015 Wrapped Preparing for light yield measurement. Approximately 5 layers of teflon tape, and 2 layers of black tape.
12/15/2015 LY scan Measurement of LY along crystal. More details in the LOGBOOK, runs xx..
02/01/2016 Thermal annealing Ramp up at 18oC/hour up to 200oC. Stays for 10 hours and ramp down at 18oC/hour.

Pictures at 12/14/2015

xxxx.
xxxx.
xxxx.
xxxx.