Difference between revisions of "MainPage:Nuclear:NPS:PWO:CrystalLOG:CRYTUR02"

From cua_phy
Jump to navigation Jump to search
Line 11: Line 11:
 
! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width:75%;" | Comments
 
! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width:75%;" | Comments
 
|-
 
|-
| 5/17/2017 || RT || LY Measure || Preparing for light yield measurement. Approximately 5 layers of teflon tape, and 2 layers of black tape.
+
| 5/17/2017 || RT || LY Measure || Preparing for light yield measurement. Approximately 4 layers of teflon tape, and 2 layers of black tape.
 
|}
 
|}
  

Revision as of 17:01, 17 May 2017

Time LOG

CRYTUR 02
Date Experimenter(s) Description Comments
5/17/2017 RT LY Measure Preparing for light yield measurement. Approximately 4 layers of teflon tape, and 2 layers of black tape.

Crystal Photos

Initial Crytur II 5/17/2017
Initial Crytur II 5/17/2017
Initial Crytur II 5/17/2017

Transmittance measurements

File:--
Longitudinal transmittance measured at Lambda 750 (no integrating sphere).
File:--
Longitudinal transmittance measured at Lambda 750 (no integrating sphere).

Light Yield

File:--
Run -- taken on 5/17/2017