MainPage:Nuclear:NPS:PWO:CrystalLOG:SICCAJ16

From cua_phy
Revision as of 13:37, 15 December 2015 by Marcoapc (talk | contribs) (→‎Time LOG)
Jump to navigation Jump to search
⇐ Back to Crystal LOG
⇐ Back to Neutral Particle Spectrometer
⇐ Back to the Main_Page

Time LOG

SICCA J16
Date Description Comments
12/14/2015 Pictures Documentation of crystal's conditions as it arrived at CUA.
12/14/2015 Wrapped Preparing for light yield measurement. Approximately 5 layers of teflon tape, and 2 layers of black tape.
12/15/2015 LY scan Measurement of LY along crystal. More details in the LOGBOOK, runs xx..

Pictures at 12/14/2015

xxxx.
xxxx.
xxxx.
xxxx.