MainPage:Nuclear:NPS:PWO:CrystalLOG:CRYTUR02

From cua_phy
Jump to navigation Jump to search

Time LOG

CRYTUR 02
Date Experimenter(s) Description Comments
5/17/2017 RT LY Measure Preparing for light yield measurement. Approximately 4 layers of teflon tape, and 2 layers of black tape.

Crystal Photos

Initial Crytur II 5/17/2017
Initial Crytur II 5/17/2017
Initial Crytur II 5/17/2017
Initial Crytur II 3/31/2017
Initial Crytur II 3/31/2017
Initial Crytur II 3/31/2017
Initial Crytur II 3/31/2017

Transmittance measurements

File:--
Longitudinal transmittance measured at Lambda 750 (no integrating sphere).
File:--
Longitudinal transmittance measured at Lambda 750 (no integrating sphere).

Light Yield

File:--
Run 3637 taken on 5/17/2017