MainPage:Nuclear:DVCS-3
Jump to navigation
Jump to search
⇐ Back to the Main_Page |
DVCS-3 Updates
- Deadtime analysis in progress: main goals include
- Determine the livetime/deadtime correction factor (LTCF)
- Take a trigger rate/live rate and normalize using the current, adjust to the prescale, and then apply the LTCF.
- To make sure the deadtime is correctly computed, the deadtime, current and prescale factors should be in agreement more than 1%, especially for the range of rates in which the deadtime is linear.
- Currently analyzing run taken in April 2016, 13418 which was a dedicated run for the deadtime analysis, at three different currents (10, 15, 20 uA) using a liquid hydrogen target.
- There are other dedicated deadtime runs taken in February 2016 with a carbon target, 12471 to 12476 at a current of ~5 uA with different prescale factors ( ).
Deadtime Analysis
Plots from run 13418: dedicated deadtime analysis run
Important ELog Updates
- Mongi's ELog update: DVCS ELOG LOGIN REQUIRED on May 1, 2017
- Mongi's ELog update: DVCS ELOG LOGIN REQUIRED on May 21, 2017