DETECTOR UPDATES

  • APD-based readout of PbWO4 (Andres, Rishabh, Richard)
  • implemented Rainer/Stefan's suggestions and now see a signal
  • to reduce background, would like to try tests with amplifier
  • discussion about amplifier availability at JLab next week (Greg, TH, + 2ODU)
  • Pixel detector update (Rachel)
  • very busy, but making good progress
  • will be overseeing the tracker integration (cylinders with tracker) - due to time constraints at other facilities some module/disk testing may have to be done as well


DIRC RECONSTRUCTION (Greg)

  • Discussion about basic principles:
  • translation of a segmented hit pattern into Cherenkov angle phase space - match track of event to look up table containing all possible combinations of photon being reflected, calculate likelihood
  • (combinatorial) background from false tracks is a big concern - some of it alleviated by use of timing information
  • reconstruction depends a lot on the expansion volume - most popular is the prism
  • important considerations in DIRC construction: optical finishing of bars, alignment
  • GlueX will use Babar DIRC bars
  • four bars per box - optical coupling
  • tests will be done on each box, but not bars separately - main concern is damage to optical glue as boxes have been used in previous experiments
  • Example of software in MIT PhD thesis [ADD]


ITEMS FOR NEXT MEETING

  • Analysis updates - postponed from today
  • Kaon data analysis Jefferson Lab 6 GeV (Marco)
  • Opportunities for pion form factor measurements with E12-09-011 (Salina)


NEXT MEETING: WED. 26 OCTOBER AT 10:00 AM (EDT)