General Meeting Summary 10/4/17
Jump to navigation
Jump to search
SHMS AEROGEL CHERENKOV
- Overall, detector with SP-30 tray shows same number of photoelectrons (13-15) as before and is working fine
- Discussion about noisy channels
- changing HV card seems to have fixed the problem
- also swapped PMT bases and changed HV cables
- Discussion about additional peak in photoelectron spectrum
- Issue fixed by fixing the Analyzer - problem was decoding of fADC
- Action items:
- take long cosmic run to verify that all is working
- Change channel 6 PMT with one of the spares that were at CERN
PBWO4 SICCAS 2017
- Discussion about best tool for measuring dimensions of crystals
- best seems digital height gage by Mitutoyo
DIRC
- Making good progress with preparations for bar movement from SLAC to JLab - currently planned for November
CERN DETECTORS
- Main efforts currently to get lab at CUA setup
- found issue with gantry not fitting into elevator to get it from basement to second floor
- possible solutions include to lift gantry to second floor from outside building, modifying elevator doors, etc. - discussions with moving/rigging company ongoing
- vacuum lines being installed
- Discussion about lower luminosity running at LHC for rest of the year - high luminosity anticipated in 2018 (needed for pixel detector studies)
DATA ANALYSIS
- DVCS deadtime analysis near completion
- E12-09-011 rate projections with acctual energies in progress
NEXT MEETING: WED. 11 OCTOBER 2017 at 10:00 AM (EDT)