General Meeting Summary 11/29/17
Jump to navigation
Jump to search
DETECTORS AT JLAB (Vladimir, Arshak, Hamlet, Greg)
- SHMS Aerogel Cherenkov detector ready - waiting for beam
- Use any opportunity when data reasonable to start detector commissioning
- NPS: setting up DAQ and crystal dimension measurements
- Some additional hardware needed: network switch, computer, scope, crates (HV, NIM), pulse generator, ethernet cable, ground, clean power (last three items being discussed with Walt Akers)
- Once have all hardware will coordinate DAQ setup with Brad
- Dimension measurements with new tool for first 20 crystals completed
- Crane operation in test lab: to avoid possible damage to crystals, keep shelves close to the back wall of the clean room
- DIRC
- First bar arrived at JLab!
- EIC R&D: tesing lens radiation hardness - earlier in year found it's not radiation hard, but more recent tests seem to indicate that the material (NLAK33, La crown glass with n~1.75, made by Schott) recovers, trying to understand the mechanism
DATA ANALYSES (Salina, Vladimir)
- DVCS analysis
- checking calculation of the dead time, with present corrections should be current independent, but it's not