DETECTORS AT JLAB (Vladimir, Arshak, Hamlet, Greg)

  • SHMS Aerogel Cherenkov detector ready - waiting for beam
  • Use any opportunity when data reasonable to start detector commissioning
  • NPS: setting up DAQ and crystal dimension measurements
  • Some additional hardware needed: network switch, computer, scope, crates (HV, NIM), pulse generator, ethernet cable, ground, clean power (last three items being discussed with Walt Akers)
  • Once have all hardware will coordinate DAQ setup with Brad
  • Dimension measurements with new tool for first 20 crystals completed
  • Crane operation in test lab: to avoid possible damage to crystals, keep shelves close to the back wall of the clean room
  • DIRC
  • First bar arrived at JLab!
  • EIC R&D: tesing lens radiation hardness - earlier in year found it's not radiation hard, but more recent tests seem to indicate that the material (NLAK33, La crown glass with n~1.75, made by Schott) recovers, trying to understand the mechanism


DATA ANALYSES (Salina, Vladimir)

  • DVCS analysis
  • checking calculation of the dead time, with present corrections should be current independent, but it's not