General Meeting Summary 12/2/19
Jump to navigation
Jump to search
ACTION ITEMS
- Update slides for EICUG SC meeting (Tanja)
- All think about possible subconveners - to be discussed in detail at the MIT meeting
SUMMARY NOTES - DISCUSSION ABOUT THE PROPOSED MODEL AND SLIDES
- Good start
- Overall approach: start with this initial version (with some edits), then evolve the structure once the actual work begins
- check effectiveness and make adjustments as needed
- Tracking (slide 2)
- Detector technologies are very different - makes tracking unique
- silicon based vertex detectors vs gaseous detectors
- total performance dominated by lever arm
- Much flux in system and difficult for one sub-convener so keep track of the evolution of the two technologies
- unclear how much Si and how much goes in which region
- Possible solution keeping one box: have one additional sub-convener to have one for each technology
- Far-forward detectors
- many different technologies - detectors have to be integrated
- More consolidated detector technologies compared to tracking, so should be manageable by one sub-convener
- Integration and Installation
- Has to be considered when evaluating detector technologies, e.g. models of cooling, power, cabling, but the details should not impact progress with the main task
- Concern about realistic model of integration at the start of the efforts
- Current simulations do not include services, but this may impact the design
- Agreement that task can likely start somewhat later
- Detector Complementarity
- evaluating detector technologies may naturally lead to this
- add box/task, but can also be started later
- Simulation is key
- Clarify that a strong simulation team is essential
- The model will only work if a strong simulation team exists and it has to go beyond the existing efforts (eRD20 and eRD17)
- Computing (DAQ and electronics)
- Special role of electronics: related to all detector technologies and has to be adequate to the DAQ model
- indicate special role clearer in diagram
- need to have good sub-conveners
- development typically takes 5-6 years (not less), so important to engage electronics groups from the start
- possibility for groups from particle physics to contribute? - there are many involved in LHC high luminosity upgrade
- Summary of organization slides
- highlight some key points in introductory slide
- split organization slide text in two
- add complementary detectors as later task, make electronics role more clear
- List of Sub-conveners
- come prepared with a list of names, but only assign after MIT meeting (after discussion)
- Table on slide 4 will be presented empty
- Names added only after discussion
- Accept suggestion from audience
- important to figure out how to reach out to less well-known groups/people
- leave opportunity for people to step up
- organically grown structure - open to all groups - evolving with time
- Plan on having one hour (closed session) from parallel session to evaluate pros/cons of subconveners - at the end of Thursday parallel session
- Could take additional time on Friday
- Add a slide to inform people of the time table