JLAB DETECTORS

  • have some data for position dependence studies - low statistics
  • SP-11 aerogel tray
  • Walter's group helping with cover
  • when SP-11 aerogel installation complete, switch out aerogel tray currently installed in SHMS (SP-15) with SP-11 tray and test it with cosmics
  • SHMS preshower worked well during KPP runs as well - observe better resolution than HERMES
  • HMS aerogel detector discussion
  • NPS PMT HV linearity tests completed
  • good linearity up to 2 MHz, which is the required range for NPS experiments
  • Next steps
  • analyze aerogel position dependence data from SHMS KPP runs
  • SP-11 tray finalize
  • HMS aerogel refurbishment - testing of PMTs, perhaps some exchange needed
  • NPS 3x3 prototype test - set up for water circulation/cooling as planned for full detector following Hall B/D examples, may require chiller


CRYSTAL STUDIES AT CUA

  • Discussion about crystal readout with APDs
  • Identified problem with LED driver and fixed it - resulting signal
  • working on precision control of driving voltage


PIXEL DETECTORS

  • Discussion about shipment of laboratory equipment from Nebraska to CUA
  • At CERN, pixel detectors are now being tested from control room, next will be complete cool down, CMS detector will be close sometime before June