General Meeting Summary 7/6/17
Jump to navigation
Jump to search
DETECTORS AT JLAB(Arthur)
- Clean (TEDF) and semi-clean (EEL 102) rooms
- Clean room is for Neutral Particle Spectrometer activities, semi-clean room for HMS aerogel Cherenkov detector refurbishing
- Shelves, tables installed
- Most hardware for data acquisition system available (VMEX, TI, fADC, NIM modules), still need a few more items, e.g. NIM crate, and guidance on system setup - check with Brad and Steve, also note that there are additional instruments in EEL126
- Required safety documents for both rooms have been submitted - meeting with B. Manzlak scheduled
- Submitted request to install lock on door to clean room - follow up with W. Akers
- Discussion about cutting/polishing equipment
- SHMS aerogel Cherenkov detector cosmic test setup
- scintillator was installed on back of detector, but to run need to discuss with GEM collaboration about trigger setup - for GEMs drift chambers and first two planes of scintillators are used
- SOS aerogel Cherenkov detector
- located in EEL126 on floor, 5-6 PMTs missing
- check with D. Mack (original owner J. Napolitano) about removing remaining PMTs for HMS aerogel refurbishment, also if can remove aerogel - refractive index is 1.05 and it is old generation aerogel (not hydrophobic)
PBWO4 STUDIES AND HMS PMTS AT CUA (Richard)
- Mechanical assembly of crystal prototype done, calibrations ongoing
- initial results indicate that vibrations are very small
- setup for load cell calibration has been constructed
- Optimization of uniformity of crystal light collection
- Testing impact of crystal surface condition on light uniformity - reflectors, surface properties
- Also testing BGO crystal characteristics in comparison to PbWO4
- PbWO4 reference (J24) result from June 2017 is 14 pe/MeV
- Discussion about double peak in pedestal in light yield measurements
- possible sources: noise in signal cabling or changing gate, e.g. from discriminator
- check for noise in signal cable: look on scope, then unplug signal from ADC and run DAQ without signal, check pedestal
- check for changing gate widths: use regular pulser instead of scintillator for gate and check on scope for possible changes
- HMS PMTs
- setup darkbox for testing
- planning to start removing PMTs from cylinders using solvent
- possible options for PMT replacements: SOS aerogel Cherenkov, SHMS aerogel Cherenkov/Bates spares
DATA ANALYSES AND SIMULATIONS (Andres)
- Work on analysis of SHMS aerogel Cherenkov detector data ongoing
- Simulations for detector configuration for pion/kaon structure function studies ongoing
- No update on DVCS analysis
DETECTORS AT CERN (Rachel)
- Material budget comparison between phase 1 and 2 suggests that detector material budget estimation from TDR was too optimistic
- Actual performance of detector layer 1 does not match design - requires more detailed studies of the impact on physics
- EPS-HEP meeting ongoing in Venice/Italy including talks on pixel detectors
- LHC currently resolving a problem that prevents from running
NEXT MEETING: WED. 12 JULY at 10:00 AM (EDT)