SHMS AEROGEL DETECTOR (Andres)
- Analyzed runs 464, 468, 488 (production runs with aerogel n=1.015) and 929 (cosmic run with aerogel n=1.011)
- Note: spectrometer coordinate system has vertical X pointing down and horizontal Y pointing beam left as seen from the target
- ~50% of events are single tracks
- Plots illustrate effect of magnet on/off on shape of data and response of PMTs
- Further SHMS aerogel data analysis ongoing including the recently installed n=1.030 cosmic - was a run taken already? What run number?
- Discussion ongoing about whether or not aerogel should be in the trigger - need to clarify this with Hall C
HMS AEROGEL DETECTOR (Richard)
- Work on removing Bates PMTs ongoing
- Setting up large diameter PMT scanning apparatus
NPS (Hamlet, Tanja)
- Updated schedule of crystal delivery will be sent soon
- 160 crystals are on the way
- Magnet still delayed, but some positive news on main coil delivery
PbWO4 STUDIES AT CUA (Richard, Vardan, Tanja)
- Simulation work to determine reflector impact on crystal light yield ongoing
- Furnace move planned for temperature profile studies
DVCS ANALYSIS (Salina)
- Working on waveform analysis to identify impact of main and random coincidences on dead time
CERN DETECTORS (Rachel)
- Ongoing activities to install instrumentation into HEP lab at CUA
OTHER (Andres)
- Installed JLab software on several CUA computers
- new computer specs are comparable or better than JLab farm computers
NEXT MEETING: WED 6 SEPT at 10:00 AM (EDT)