DETECTORS AT JLAB (Arthur, Richard, Andres)
SHMS AEROGEL CHERENKOV DETECTOR
- Aerogel tray has been exchanged successfully - SP-30 is now installed
- Total time was about 3 hours - faster than before due to optimization of procedure
- Tray exchange requires two techs and one expert
- pre-planning (tools, materials like black tape and o-rings, survey of tray to be installed, covers) is essential
- Two damaged bolts have to be fixed: top left and top right angle - note that design is not optimal and expect this to happen again after tray exchanges
- drilling should not affect aerogel in tray, but have to be careful
- Action item: replace two bolts
HMS AEROGEL CHERENKOV DETECTOR
- Examined SP-15 aerogel (looks fine) and SP-30 aerogel (seems less transparent than that from Bates - change?)
- Examined reflector - may consider changing to Gore
- Discussion of status of PMTs
- Two dead XP4572 PMTs remain to be removed
- Next have to remove Bates XP4500 PMTs from their cylinders (without breaking them!) and install these into the vacated HMS detector cylinders
- need to pay attention to potential removal of paint on PMTs - light leaks!
NEUTRAL PARTICLE SPECTROMETER AND PBWO4 STATUS
- 50 PMTs should be at JLab - Arthur will check - 150 more on the way
- SICCAS informs of a delay in shipment of PbWO4 crystals - target date for all 460 crystals is now end of September
- Discussion of crystal testing procedures at CUA
- Quality assurance plan discussions ongoing
- IPN-Orsay sent schedule - need to discuss together with planned work at JLab and CUA to accomplish goals
DATA ANALYSIS: DVCS (Salina)
- Discussion of observed current dependence of the dead time of the data
- for given event, trigger of interest (S2&&Cer) does not always increment - seems to indicate that event is triggered by something else. This happens every ~12 events.
- there is a variable one could look at that identifies the detector that triggered each event. More information on the DVCS trigger at this location
- Questions:
- does "Master or" consider events of all possible trigger modes (there are at least 10)?
- what does "CODA event rate" mean? - events from "s2m and CER"?
STUDIES AT CUA (Andres, Dannie)
- Structure function projections - bin optimizations ongoing
- Pulse generator
- use TTL (positive) output, which has the required specifications and convert to NIM (negative) - do that by inverting LED current, switch the legs
DETECTORS AT CERN (Rachel)
- Two highschool physics teachers from DC area participate in Quarknet program at CERN
- learn about pixel detectors and also other detectors concepts, e.g. importance of material budgets
- discussion about recruiting strategies
- Data analysis ongoing
- Shifts upcoming in October and December
- CUA lab setup will begin in late August