General Meeting Summary 9/21/16

From cua_phy
Jump to navigation Jump to search

JLAB DETECTOR UPDATES (Arthur)

  • Inner tray assembly for SP-11 aerogel detector tray is complete. Next step will be to install the wires (safety feature for aerogel tiles once installed)
  • NPS prototype tests can commence - all necessary safety training was completed
  • Action items:
  • Bring SP-11 aerogel tiles to JLab in week 26th Sept
  • Estimate density of materials for SP-11 tray - important for delta electron generation/contribution in experiments
  • Start NPS prototype tests of PMT shielding in magnetic field


KAON DATA ANALYSIS (Marco)

  • A missing normalization factor was found and is now included in the analysis
  • Discussion of current analysis results
  • Action items:
  • Optimize model and binning
  • Determine dt for each bin - will be helpful for decisions on t-binning
  • Extract kaon FF using the most recent cross sections
  • Check that results from 3-parameter and 4-parameter unseparated cross section fits give the same separated cross section result - assumes that 4-parameter fit converges


PROJECTIONS FOR UPCOMING KAON EXPERIMENT (Salina)

  • Working on projections of pion statistics that will be taken during our kaon electroproduction experiment last year - depending on stats and projected systematics, this may provide important information on pion form factor at low Q^2


APS-BASED READOUT OF PBWO4 CRYSTAL DETECTORS (Andres, Rich, Rishabh)

  • Work done in context of Neutral Particle Spectrometer construction and also PbWO4-based calorimeter at the Electron-Ion Collider. Main question: is APD or PMT based readout is more favorable?
  • Discussion about seeing first signals using a SiPM kit from CAEN
  • Next steps: use the Hamamatsu APDs we have at CUA and construct an LED-based system that can be read through our data acquisition system
  • Action items:
  • Locate the specifications for the Hamamatsu APDs
  • Read Hamamatsu APD signals with CUA ADC
  • Measure crystal with APD and compare to crystal with PMT


UPDATE ON CMS PIXEL DETECTORS (Rachel)

  • Module construction at Nebraska almost done. Next will be focus on mounting modules on disks at Fermilab etc.
  • Installation at CERN will be in early Spring 2017
  • Brief discussion about building the spare modules at CUA in 2017


STATUS OF GLUEX AND DIRC DETECTORS (Greg)

  • General discussion about GluEx status
  • Some data taken in Hall D over the last year, calibrations ongoing
  • Many opportunities for data analysis - working on identifying specific channels that could be CUA project
  • General discussion about GlueEx upgrade, and in particular DIRC detectors
  • upgrade will use parts of the Babar DIRC
  • transportation is a complex procedure - CUA will be involved in checking the integrity of the bars


NEXT MEETING: WEDNESDAY, 28 SEPTEMBER, 10:00 AM (EDT)