MainPage:Nuclear:NPS:Design
Jump to navigation
Jump to search
Frame
NPS frame design scaled from HyCal
Frame design drawing from HyCal
Magnet
Status of the main coil - update from Buckley Systems (8/22/17)
- Coil shipment delayed until end of November 2017 due to tooling modifications needed and company mis-calculation of total amount of copper needed
Status of the corrector coil - delivered and at JLab in test lab
Status of yoke
- earlier drawings