Difference between revisions of "MainPage:Nuclear:NPScalorimeter"
Jump to navigation
Jump to search
Line 84: | Line 84: | ||
* Can we move instrument downstairs? | * Can we move instrument downstairs? | ||
* Clean room in which instrument is located | * Clean room in which instrument is located | ||
− | * Consult manual (Miguel P., NP group) | + | * Consult [http://www.vsl.cua.edu/cua_phy/images/8/8d/CP160_RevB_Combined.pdf CP160 manual] (Miguel P., NP group) |
* Check radiation requirements | * Check radiation requirements | ||
* Think about measurement of accumulated dose. Is there something in the instrument? | * Think about measurement of accumulated dose. Is there something in the instrument? |
Revision as of 19:17, 1 November 2015
⇐ Back to the Main_Page |
The Neutral Particle Spectrometer
Latest news
- NPS meeting 12 November at 9:00 AM
- Two presentations related to NPS at the DNP2015 (ERK PH0006,TH NH0004)
- 30 PbWO4 crystals from SICCAS arrived - testing to start soon
- CUA and IPN-Orsay receive award from EIC detector R&D for crystal procurement and crystal quality tests
- Congratulations to the NPS collaboration! We were awarded with the NSF MRI (PHY-1530874), so now we can start building the Neutral Particle Spectrometer!
Components characterization and detector construction
Detector Construction |
⇒ | x150px Pictures |
![]() Detector design |
![]() Reference Material | |
| |||||
PWO crystals characterization |
⇒ | ![]() Light transmittance |
x150px Radiation hardness |
x150px Light yield |
|
| |||||
Other components | ⇒ | x150px Photomultipliers and photodiodes |
x150px Temperature stabilizer frame |
x150px Digitizing electronics |
|
| |||||
Simulations | ⇒ | x150px Detector resolution |
NPS Crystal Test Planning
Summary from 10/27/2015 meeting
Participants: MAPC, SA, TH, MB, ILP
Measurement of Transmittance using Spectrometer Lambda 750
Transverse Transmittance (stepper motor)
- Testing Subset of Crystals
- Micro-switch to be bypassed for operation with opened door?
- Can anything be damaged if someone opens the machine while operating it?
- Would any accidental light leak be detrimental to the experiment?
- See manual
- Contact company to find out more info (MAPC, Marek)
- Conceptual Test for the stepper motor inside the spectrometer
- Next week: (11/2 – 11/6) - Test with a black cloth.
Longitudinal Transmittance
- Testing Subset of Crystals
- What is the purpose of the windows? Should we remove them?
X-ray Irradiation
- Check with CUA radiation safety before testing machine. (TH, Miguel P., ILP)
- Can we move instrument downstairs?
- Clean room in which instrument is located
- Consult CP160 manual (Miguel P., NP group)
- Check radiation requirements
- Think about measurement of accumulated dose. Is there something in the instrument?
- Search for options of dosimeters (CUA/JLab/internet).
- Check out instrument
- Calibration scheduling (TH, ILP, Miguel P.).
Additional Points
- Talk with Miguel to inform him of everyone that is working with the spectrometer.
- Build a dark box as a more permanent solution for crystal measurements. (2016, when we have more crystals, NPS group)
To Be Discussed
- NPS frame construction startup (once design drawings ready, est. early 2016)
- NPS magnet construction startup (once design drawings ready, est. early 2016)
The NPS Collaboration at Jefferson Laboratory
- Institution1
- Name 1
- Name 2
- Institution2
- Name 1
- Name 2