Difference between revisions of "MainPage:Nuclear:Summer2018"

From cua_phy
Jump to navigation Jump to search
Line 46: Line 46:
 
== Meetings and slides ==
 
== Meetings and slides ==
  
*'''7/2/2018 -
+
*'''7/2/2018 - Progress and Updates
:* Update on Kaon/Computing setup: [[https://docs.google.com/presentation/d/1OdiZtu1Tkxk5JHu5GHJ1uXGedCGADmlBYKZrO7rlLRU/edit#slide=id.g3d455204c2_0_63 Callum]]
+
:* Update on Kaon analysis and Computing setup: [[https://docs.google.com/presentation/d/1OdiZtu1Tkxk5JHu5GHJ1uXGedCGADmlBYKZrO7rlLRU/edit#slide=id.g3d455204c2_0_63 Callum]]
 
:*  
 
:*  
 
:*  
 
:*  

Revision as of 15:36, 5 July 2018

⇐ Back to the Main_Page


Projects - Summer 2018
Project Students
Kaon Data Analysis from Spring 2018 Run Callum
Crystal Drawing Instrumentation Assembly and Testing Richard/Callum
Hall A/C Computing Setup for Kaon LT & DVCS Data Analysis at CUA Salina Ali
Callum Walton
Investigation of Low Index Aerogel for Detector Optimization Juan
Investigation of Systematic Effects on Crystal Resolution and Detector Performance Diana
DVCS3 Data Analysis Salina
Kaon LT Experiment Richard
Preparations for kaon experiment (E12-09-011) All

Meetings and slides

  • 7/2/2018 - Progress and Updates
  • Update on Kaon analysis and Computing setup: [Callum]