General Meeting Summary 4/12/17

From cua_phy
Revision as of 13:00, 12 April 2017 by Hornt (talk | contribs) (Created page with "DETECTORS AT JLAB * Aerogel ::* SP-11 tray now has the additional structure installed to accommodate the 9th layer of aerogel tiles ::::* Picture without reflector ::::* Picture...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

DETECTORS AT JLAB

  • Aerogel
  • SP-11 tray now has the additional structure installed to accommodate the 9th layer of aerogel tiles
  • Picture without reflector
  • Picture with reflector
  • next: install wires

To be continued soon .....