General Meeting Summary 12/2/19

From cua_phy
Revision as of 16:30, 3 December 2019 by Hornt (talk | contribs) (Created page with "ACTION ITEMS * Update slides for EICUG SC meeting (Tanja) * All think about possible subconveners - to be discussed in detail at the MIT meeting SUMMARY NOTES - DISCUSSION AB...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

ACTION ITEMS

  • Update slides for EICUG SC meeting (Tanja)
  • All think about possible subconveners - to be discussed in detail at the MIT meeting


SUMMARY NOTES - DISCUSSION ABOUT THE PROPOSED MODEL AND SLIDES

  • Overall approach: start with this initial version, then evolve the structure once the actual work begins
  • check effectiveness and make adjustments as needed
  • Tracking (slide 2)
  • Detector technologies are very different - makes tracking unique
  • total performance dominated by lever arm
  • vertexing brings in position resolution
  • Much flux in system and difficult for one sub-convener so keep track of the evolution of the two technologies
  • unclear how much Si and how much goes in which region
  • Possible solution keeping one box: have two sub-conveners, one for each technology
  • Far-forward detectors
  • many different technologies - detectors have to be integrated
  • More consolidated detector technologies compared to tracking, so should be manageable by one sub-convener
  • Integration and Installation
  • Has to be considered when evaluating detector technologies, e.g. models of cooling, power, cabling, but the details should not impact progress with the main task
  • Concern about realistic model of integration
  • Current simulations do not include services, but this may impact the design
  • Detector Complementarity
  • Should also be considered when evaluating detector technologies
  • Simulation is key
  • Clarify that a strong simulation team is essential
  • The model will only work if a strong simulation team exists and it has to go beyond the existing efforts (eRD20 and eRD17)
  • Computing (DAQ and electronics)
  • Special role of electronics: related to all detector technologies and has to be adequate to the DAQ model
  • need to have good sub-conveners
  • development typically takes 5-6 years (not less), so important to engage electronics groups from the start
  • possibility for groups from particle physics to contribute? - there are many involved in LHC high luminosity upgrade
  • List of Sub-conveners
  • come prepared with a list of names, but only assign after MIT meeting (after discussion)
  • Table on slide 4 will be presented empty
  • Names added only after discussion
  • Accept suggestion from audience
  • important to figure out how to reach out to less well-known groups/people
  • leave opportunity for people to step up
  • organically grown structure - open to all groups - evolving with time
  • MIT Meeting
  • Plan on having one hour (closed session) from parallel session to evaluate pros/cons of subconveners - at the end of Thursday parallel session
  • Could take additional time on Friday
  • Add a slide to inform people of the time table